G104 National Road Project
The G104 National Road Reconstruction Project of the first-class highway from Chuzhou to Chahe in Chuzhou, Anhui Province, connects Chahe Development Zone, Suzhou-Chuzhou Industrial Park and Chuzhou Industrial Transfer Demonstration Park. The total length of this project is 50.5 kilometers, and it will be constructed in three phases. The first and second phases are 23.89 kilometers long, with eight lanes in both directions and a 50-meter-wide roadbed. Lithium battery solar street lamps will be used. The pole height is 12 meters, with 150W+30W LED light source. The first phase consists of the first section and the second section. The total installation length of the two sections is 10.65 kilometers. Among them, 290 units will be installed in the first section and 310 units in the second section. The first phase of the project started construction on March 2, 2016 and was completed and handed over for acceptance on July 14, 2016. The second phase consists of the third and fourth sections, with a total installation length of 13.24 kilometers. Among them, 329 units will be installed in the third section and 340 units in the fourth section. The second phase of the project began construction on September 2, 2016 and was completed and handed over for acceptance on January 14, 2017. The G104 National Road Project is a key project for Chuzhou City to implement the national transportation development plan for the 12th Five-Year Plan. This project adopts Langyue solar street lamps, and the standards for street lamp illuminance and other aspects all exceed the national requirements. It is of great significance for creating the first impression of Anhui, building a beautiful Chuzhou, promoting the development along the line, and achieving rapid and seamless connection with Nanjing.
- 芒市政府携手朗越能源共同打造智慧城市和美
- 朗越能源荣获2020光亚展暨第八届阿拉丁
- 朗越能源战略联盟徽宁集团 第二批集团销售
- 朗越能源战略联盟徽宁集团 集团销售精英首
- 面对连绵多雨的梅雨季,您选择的太阳能路灯
