G104 National Highway Project
The G104 National Highway Reconstruction Project is located in Chuzhou-Chahe Reach of Chuzhou, Anhui Province. It connects Chahe Development Zone, Suchu Industrial Park and Chuzhou Industrial Transfer Demonstration Park. The total length of the project is 50.5 kilometers. It is constructed in three phases. The length of the first and second phases is 23.89 kilometers, the two-way eight lanes and the width of the roadbed is 50 meters. Lithium electricity is used. Solar street lamp, pole height 12 meters, 150W + 30W LED light source. The first stage is the first stage and the second stage. The total length of the two stages is 10.65 kilometers. Among them, 290 are installed in the first stage and 310 are installed in the second stage. The first phase of the project started construction on March 2, 2016 and completed acceptance on July 14, 2016. The second stage is the third and fourth bidding sections. The total installation length of the two sections is 13.24 kilometers. Among them, 329 are installed in the third bidding section and 340 are installed in the fourth bidding section. The second phase of the project started construction on September 2, 2016 and completed acceptance on January 14, 2017. G104 National Highway Project is the key project for Chuzhou to implement the national transportation "Twelfth Five-Year Plan". The project adopts Langyue Solar Street Lamp and street lamp illumination standards which exceed the national requirements. It creates the first impression of Anhui, builds a beautiful Chuzhou, drives the development along the line, and achieves rapid seamless docking with Nanjing. It is of great significance.